Utilizing BIM for Trade Coordination   Building Information Modeling ( BIM ) is a process that uses 3D models to represent a building or infrastructure project. BIM can be used to improve trade coordination by providing a single source of information for all stakeholders. This can help to identify and resolve conflicts early in the design process, which can save time and money. ➡️ What is BIM? BIM is a process that uses 3D models to represent a building or infrastructure project. BIM models can be used to represent the physical and functional aspects of a project. This information can be used to improve communication, collaboration, and decision-making throughout the project lifecycle. 🎯 Read More:- What is BIM (Building Information Modeling) & 7 Levels of BIM ➡️ How BIM can optimize trade Coordination It’s useful to look at steps of the coordination workflow from the perspective of the BIM coordinator. BIM can optimize trade coordination in a number of ways. First, it can he...

DC Home Owners and Business Owners – Know the Right Way to Remove Your DCRA Stop Order | Tejjy Inc.

Are you stuck with your Stop Order from DCRA? Have you exceeded the scope of permits? Or have started without DCRA a permit? Did you fail to notify your neighbors as per DC code as your construction affecting adjoining properties?  
Whatever may be the cause, it’s a matter of concern if you get a stop order. Illegal construction involves safety hazards. A DCRA STOP WORK ORDER means zero access to your house till it gets lifted and a hefty fine.  

  1. You should not remove the orange stop-work order placard. 
  2. Take time, complete your review request form for stop-work order compliance, and submit it to dcra.illegalconstruction2@dc.gov. You may also drop it to DCRA Office within 15 days of receiving your stop-work order. 
  3. Entitle single-point contact to complete the process for avoiding delays. Nevertheless, you can add additional emails to be carbon copied on the correspondence. 
  4. You will receive email communication from the administrative reviewer within five business days of your submission. The message will arrive at the email address that you have submitted on the form, containing a complete checklist of the items needed to resolve your stop order. In case, you don’t get the message within five days, check your spam folder. 
  5. The next step will be to review the specifications and reply to the message, mentioning the day you plan to come for submitting drawings, obtaining permits, or scheduling inspections if necessary. Immediate response is needed so that the administrative reviewer could temporarily lift the system hold for you. 
  6. Just the once you complete all items on the checklist, communicate with Illegal Construction Inspections @ https://dcra.dc.gov/crm. You may also call (202) 442-STOP (7867) for requesting a follow-up inspection and verifying compliance. Always mention your address and contact details. The inspector will inform the administrative reviewer whether your case is compliant or not. However, you should not remove the stop-work order till approved by the administrative reviewer. 
  7. Consequently, you will get a Notice of Violation through the mail, imposing a penalty. You should follow the instructions and respond straight to the Office of Administrative Hearings about the fines. 
Did you get a STOP WORK ORDER for your construction? Are you looking for DCRA Permit Expedition Services? Call us at 202-465-4830
We at Tejjy know the right process to get your STOP Work Order Removed! We are permit facilitators and have experience in the process. Our experts handle all your paperwork coordinating between the city and other jurisdictions, and local government bodies (DDOT, DC Water, DOEE). Our clear understanding of DCRA Permit Fees, DCRA Postcard Permit, DCRA Afterhours Permit and project requirements specific to jurisdiction prevents delays in project approval. 

Comments

Popular posts from this blog

How BIM can optimize trade coordination for your project needs?

What are the BIM data requirements for Facility Operations & Maintenance?

How International Airports are Implementing Revit BIM for Construction Efficiency?